Aerial view of M Street Residences, a multi-unit building Valley Vista Builders built in Valley Village, with the mountains beyond

    Home rebuild in Pasadena

    Eaton Fire Rebuild Contractor in Pasadena

    The January 2025 Eaton Fire destroyed 185 structures inside the City of Pasadena, most of them single-family homes and the garages and sheds behind them. If your lot is within city limits, your rebuild is reviewed and permitted by the City of Pasadena, which adopted its own rebuild ordinance, fee waivers and an expedited plan check for fire-destroyed homes. Valley Vista Builders is a licensed general contractor that manages design coordination, engineering, permits and construction for fire rebuilds. Call for a free consultation, and we will confirm which agency covers your address and what the City's rules allow on your lot.

    Call (310) 927-2646

    Licensed general contractor. CSLB License #1116787.

    Free consultation

    Plan your Pasadena project with us

    • Licensed general contractor · CSLB #1116787
    • One in-house team from consultation to final walkthrough
    • We reply within 24 hours

    Get your free consultation

    Tell us about your project and we will get back to you within 24 hours.

    Your Details

    A phone number or an email address is enough to reach you.

    The Project
    Project Details

    We respond within 24 hours. Your information is kept confidential. See our Privacy Policy.

    Where the fire reached inside Pasadena

    City staff reports place the losses in four neighborhoods: Upper Hastings Ranch, Victory-Rose, Dundee Heights and NATHA. A February 2025 City Council presentation counted 117 single-family homes, 12 apartment or townhouse units, 3 ADUs, 5 commercial structures and 59 accessory structures among the 185 destroyed. Upper Hastings Ranch alone accounted for 92 structures, including 80 homes, and it sits within the City's hillside overlay districts.

    The housing that burned varies a lot by street. The City's survey describes the NATHA and Dundee Heights homes as mostly 1920s and 1930s bungalows, the Victory-Rose homes as largely 1940s, and the Upper Hastings Ranch homes as built from the 1950s through the 1980s on larger lots, many with pools. That history matters, because the City measures what you may rebuild against what stood on the site the day before the fire.

    Pasadena or Altadena: two different permit offices

    Much of the Eaton Fire burn area lies in Altadena, which is unincorporated Los Angeles County. Mailing addresses do not follow city limits, so a Pasadena address alone does not mean the City of Pasadena permits the home. Altadena rebuilds go through the County process, with its own forms, reviewers and rules, which we describe on our Altadena rebuild contractor page.

    The difference is practical, not just a matter of paperwork. When Pasadena adopted its rebuild standards in early 2025, City staff noted that two of its local allowances, moving the house to a different spot on the lot and an automatic 12-month permit extension, were not part of the County's rules for Altadena at that time. We check the parcel's jurisdiction before any drawings are started.

    What the City's rebuild ordinance allows

    In March 2025 the City Council adopted Interim Ordinance No. 7444, and in May 2025 it extended the ordinance with Resolution No. 10125 for roughly another two years. A fire-destroyed structure can be rebuilt without a City land use entitlement when it meets four tests: it sits in substantially the same location, or in a spot that meets setbacks or matches the old nonconforming setback; it grows no more than 200 square feet or 10 percent of the prior footprint or floor area, whichever is greater; it is no more than 10 percent taller; and a one-story house does not become two stories.

    The baseline is the condition of the structure on January 6, 2025, so old permits, plans and photos become important evidence. A design that goes beyond those limits is not barred, but it must meet every standard of the zoning district and any discretionary review that comes with it. The ordinance also gave active zoning entitlements and building permits citywide an automatic 12-month extension.

    Upper Hastings Ranch and the hillside overlay

    In the Upper Hastings Ranch hillside overlay, a second-floor addition normally requires a Hillside Development Permit with a public hearing. A rebuild that stays within the ordinance avoids that step, but replacing a one-story house with a two-story one does not. In one October 2025 case the City required a Hillside Development Permit, story poles, a mailed notice to properties within 500 feet and a geotechnical report for exactly that kind of rebuild.

    That case also shows the standards a larger design must meet in the area, including a 25-foot or two-story height limit, a second floor capped at half the first floor area, and extra setbacks for the upper story. We lay out both paths, staying within the ordinance or going through full hillside review, with the cost and schedule of each before you commit.

    Fee waivers, plan check and standard plans

    Pasadena's Fire Rebuild Fee Waiver and Refund Program waives City plan check and permit fees for eligible rebuilds. As of 2026 the City lists these conditions: the home was a single-family residence or condominium that was owner-occupied on January 7, 2025, at least one structure was red-tagged by the City for Eaton Fire damage, and the rebuild meets the rebuild ordinance. Water service fees, a flat $1,000 construction and demolition waste deposit and fees charged by outside agencies such as school districts are not waived, and new structures that did not exist before the fire do not qualify. The City Council also exempted eligible rebuilds from the City's Construction Tax in September 2025.

    For review, the City set up a dedicated team that committed to a first plan check review within two weeks, later rounds within one week, and next-business-day inspections. It has also partnered with the Foothill Catalog Foundation on standard home plans and said it will pre-review some of them so they take less time to check. Programs like these change, so we confirm the current terms with the City when your project begins.

    How we run a Pasadena rebuild

    We start with the record: prior permits, plans, the City's assessment photos and anything that documents the footprint, floor area and height before the fire. From there we work with your architect or designer on a plan that fits either the ordinance limits or the full zoning standards, and we coordinate the soils report, structural engineering and current energy and fire code requirements, which apply to the new house either way.

    You receive a written scope and estimate you can share with your insurer, and regular updates once construction starts. We do not promise review times or approvals, since both depend on the City and your design, but we keep the submittals complete so the review has what it needs.

    Local notes

    Building in Pasadena

    The Eaton Fire losses inside the City of Pasadena were concentrated in Upper Hastings Ranch near the foothills and in the Victory-Rose, Dundee Heights and NATHA neighborhoods along the city's northern edge. Rebuilds within city limits are reviewed by the City of Pasadena Planning and Community Development Department under Interim Ordinance No. 7444, while neighboring Altadena is unincorporated Los Angeles County with a separate process. Upper Hastings Ranch lots fall within the hillside overlay, where adding a second story generally brings a Hillside Development Permit. We confirm the jurisdiction, the pre-fire record and the current status of the City's rebuild programs for your parcel before design begins.

    Questions

    Common Questions

    Free consultation

    Ready to start your home rebuild project?

    Free consultation, honest estimate, and one licensed team from design through final inspection.

    Valley Vista Builders Inc. · CSLB License #1116787

    Your Details

    A phone number or an email address is enough to reach you.

    The Project
    Project Details

    We respond within 24 hours. Your information is kept confidential. See our Privacy Policy.